STRUCTURE
All types of Columns, Beams, Lintel , Chajja & RCC slabs etc, in sub structure & super structure shall be with M- 15 & M- 20 grade of concrete.
BRICK WORK
All Brick work shall be with K.B / concrete block /Hallow Bricks.
PLASTERING
All inside & out side wall shall be plastered in (1:6) prop. All ceiling area shall be plastered (1:4) prop.
STORAGE SPACE
Suitable spaces & sizes shall be provided for Cup – Boards.
FLOORING
Vitrified Tiles / Ceramic Tiles /Marbles.
WALLS
Ceramic wall tile up to 7’ – 0 “ height in toilet and up to 2’ -0” height in Kitchen. Granite slab for working top in kitchen with stainless steel kitchen sink.
DOOR FRAMES
Main door – wooden and all other doors R.C.C. Choukatha.
INSIDE DOORS
Shutter Decorative seasoned teak wood main door and internal doors are Company made flush doors.
WINDOWS
Aluminum windows with protective M.S. Grill.
PAINTING
All interior wall surfaces are painted with oil bound distemper and all outside walls with Exterior Emulsion (Weather Proof)
ELECTRICAL
All electrical wiring with premium brand fire resistant insulated copper wire/cable in concealed conduits. Switches & Sockets of Modular range. A.C. Points in all Bed Rooms.
SANITARY
Hindware / Parryware or equivalent. Hot & cold water provision in all Bath Rooms.
C.P. fitting of reputed make.
Amenities
3 Storied Air – Conditioned Club House with
A/C Multi Gym – Men & Women With Toilet
A/C Pool Table With Toilet
A/C Table Tennis With Toilet
A/C Multi Purpose Hall For Meeting / Parties With Toilet
Card room / Library
Shop (Variety Store)
Society Office
Centralized Children Park With Fountain
All Round Landscape Park With Decorated Statue
Jogging Track .
Sewage Treatment plant (STP)
4 Wheel Guest Parking.
Bookings And Payments
1. 10% of the bare cost of the flat along with application form against booking.
2. 15% of the cost on execution of the agreement for sale of flat or 60 days from the date of booking whichever is earlier.
3. 12.5% of the cost on completion of Basement Casting.
4. 12.5% of the cost on completion of 1st floor Casting.
5. 12.5% of the cost on completion of 2nd floor Casting.
6. 12.5% of the cost on completion of 3rd floor Casting.
7. 10% of the cost completion of Brick work & inside plasters of flat.
8. 10% of the cost completion of flooring work & other finishing work.
9. 5% of the cost before taking over position of the unit.
Avalability
SL NO. BLOCK NO BHK SBA(SFT) RATE Status
1 A1 3BHK 2289 2400 Available
2 B1 - B2 3BHK 1720-1767 2400 Available
3 B3 3BHK 1838-1885 2400 Available
4 C1 - C2 2BHK 1287-1379 2400 Available
|